15374678 Spare Parts 5.58 ACCUMALATOR ASSY (UNCHARGED) LP
Here are some of our spare parts:
BG00733106 | DRIVE SHAFT | 26.3501 | |
11994312 | A UNIVERSAL COUPLING | ||
507091 | FILTER ELEMENT | 0.76 | |
3222338477 | TRACK ASSEMBLY | 526 | |
3222331017 | AIR COMPRESSOR REPAIR KIT | 0.09 | |
0102062600 | PIN | 0.055 | |
0259204200 | DENTAL BRACES | 0.001 | |
0666600017 | SEAL | ||
0666600010 | SEAL | 0.14 | |
0666600035 | SEAL | 0.1 | |
4350258406 | BUSHING2H REPAIR KIT | 27.1 | |
3222301179 | PLC WITH PROGRAM | 0.695 | |
2662118000 | NUT | ||
55210177 | EXHAUST SILENCER | 0.04 | |
AF02300003 | WASHER, PLAIN, NORMAL | 0.001 | |
86751879 | SEAL KIT – BOM PATH IN T-TEXT | 0.02 | |
77018299 | FUEL PREFILTER | 1.5 | |
9106066600 | BALANCE VALVE | 0.55 | |
5112300090 | BUSHING | 1.3 | |
5112252500 | BUSHING | 1.1 | |
55178638 | PRESSURE SWITCH ASSEMBLY RB | 0.78 | |
6060012039 | REPAIR KIT 3222327728 | 0.04 | Sealing element |
88676409 | V-BELT | 0.2 | |
BG00917477 | SET OF SEALS | 0 | |
BG00917680 | SET OF SEALS | 0 | |
55099910 | AIR FILTER | 0.16 | |
0570501017 | NIPPLE | 0 | |
0570501018 | CONNECTOR | 0 | |
3177305400 | CONNECTOR | 0 | |
3176227900 | CONNECTOR | 0 | |
3176698100 | CONNECTOR | 0.095 | |
3176733600 | NIPPLE | 0 | |
3176650100 | NIPPLE | 0 | |
3176734100 | NIPPLE | 0 | |
3176650900 | NIPPLE | 0 | |
5590021543 | FILLING PUMP | 7.3 | |
3715058100 | CONNECTOR | 0 | |
3176649500 | CONNECTOR | 0 | |
3176306000 | NIPPLE | 0 | |
3715058400 | ELBOW NIPPLE | 0 | |
3715058500 | NIPPLE | 0 | |
3715058900 | CONNECTOR | 0 | |
81775009 | BEARINGRB | 0.4 | |
71407540 | BEARING | ||
5575701302 | VALVE | 1.7 | |
5537890000 | CAPSCREW | 0.01 | |
3222333319 | RELAY SOCKET | 0.02 | |
3222347519 | RELAY | 0.015 | |
3176001519 | RELAY | 0.015 | |
3176404900 | TERMINAL BLOCK | 0.01 | |
55095260 | PISTON SEAL | 0.2 | |
55095462 | PISTON GUIDE RING | 0.001 | |
55153446 | DIRT RING | 0.018 | |
55095499 | SEAL | 0.03 | |
55095543 | O-RING | ||
55155994 | GUIDE RING | ||
55155993 | GUIDE STRIP | ||
55095415 | ROD SEAL | 0.02 | |
55153428 | DIRT RING | 0.023 | |
55151043 | WIPER | 0.1 | |
55095545 | PISTON ROD GUIDE RING | 0.048 | |
5573874400 | SENSOR | 0.34 | |
9106185607 | PRESS.TRANSDUC. | 0.165 | |
5536996900 | GEAR | 4.7 | |
8204049897 | SOLENOID VALVE | 0.2 | |
3222340627 | CHAIN LOCK | 0.33 | |
0661150065 | CUSHION | 0.001 | |
0665001012 | SHAFT SEAL | 0.005 | |
0665910017 | WIPER | 0.015 | |
0665080071 | COMBINED SEAL | ||
3115924297 | REPAIR KIT 12H | 37.9 | |
6060012533 | REPAIR KIT 312825945 | 0.08 | |
3128304301 | SEAL | 0.07 | |
3128309338 | REPAIR KIT | 0.01 | |
5726801206 | PIN | 0.1 | |
5726500856 | TENSIONING CYLINDER | 12.7 | |
5726500096 | BEARING | ||
5726500297 | PISTON ROD | ||
5726500298 | COVER | ||
5726500300 | PISTON | ||
5726500097 | CIRCLIP | ||
5726801193 | PIN | 0.4 | |
55019118 | DEEP GROOVE BALL BEARING | 0.99 | |
55019117 | DEEP GROOVE BALL BEARING | 1.05 | |
55054064 | CYLINDER | 90 | |
3222309747 | MINIMUM ORDER QUANTITY OF BUSHING | ||
BG00323348 | OIL AND AIR FILTER KIT | 1.09 | |
BR00050634 | SAFETY FILTER | 0.16 | |
55002637 | REAR COVER | 1.2474 | |
15184708 | AXIS | 1.48 | |
001022-001 | DRIVELINE ASSEMBLY | 11.5 | |
002746-001 | MOTOR, 7.25 CU IN | 44 | |
020123-052 | FILTER ELEMENT | ||
70180419 | BUSHING | 0.05 | |
C190001151 | JAW | ||
55019131 | HOLLOW SHAFT | 0.01 | |
56028954 | PRESSURE RELIEF VALVE | 0.1 | |
15205558 | DIAPHRAGM | 0.04 | |
3128302392 | CHECK | ||
71100169 | HOURMETER | 0.152 |
About us:
Established in 2011, JUNTAI is a company dedicated to making and selling after-market spare parts for Sandvik and Epiroc mining engineering machineries. Its parent company, Jinjiang Wantai, was established in 1989, with a plant area of 10,000㎡, and its products have passed the ISO9001:2015 quality system certification. Yunnan Wantai, a subsidiary of the parent company, is one of the largest companies selling drilling rigs in southwest China.
Our Clients:
Power Construction Corporation of China, China Energy Engineering Corporation Ltd. China Railway Construction Corporation Ltd. Jinchuan Group Co., Ltd. Pangang Group Company Ltd. China Railway Tunnel Bureau Group Co., Ltd. China Wuyi Co., Ltd. CGC Overseas Construction Group Co., Ltd. Yunnan Phosphate Chemical Group Co., Ltd. Yunnan Tin Group Co., Ltd. Yunnan Copper Industry (Group) Co., Ltd. Yuxi Yukun Iron and Steel Co., Ltd. Yunnan Hualian Zinc& Indium Stock Co., Ltd. China Anneng Construction Group Co., Ltd.
Why Choose JunTai Machinery:
1.Industrial Experience
With 30 years of experience in making and selling construction machinery, the company has built a great client base and excellent reputation throughout China, and sold products to many foreign countries and regions.
2.Quality Assurance
All of our products are subject to strict testing and real machine inspection to ensure that all sold products could work as along as the service lives warrantied by original manufacturers.
3.Fast Delivery
We have large-scaled spare part warehouses in Fujian and Yunnan with comprehensive stocks to ensure timely delivery.
FAQS:
What are the main products of your company?
Spare parts for Epiroc and Sandvik machine, spare parts for drilling rigs, drilling jumbo, scrapers, the kinds of spare parts include JUNTAI (self-produced products), substitution (made in China or import from abroad), OEM (original equipment manufacturer).
What to offer for inquiry?
Please provide part number and actual demand quantity for inquiry. If the description is different with the part number, the part number prevails.
How long does our price valid?
Price lists are only valid for 30 days, follow the principle of priority sales.
Does this price include the duty?
All prices are exclusive of 13% VAT and other taxes or official duties.
What about the terms of payment?
30% advance payment, full payment before delivery.
What about the typically delivery time?
We have spare part stocks in our warehouses, which can be shipped on each working day. In case no ready products available at warehouses, we can prepare for delivery after receiving 30% deposit. After receiving the prepared products at warehouse, the shipment could be arranged on the closest business day immediately. The delivery may be ahead of schedule or delayed due to inventories of raw materials or the number of orders.