3115295000 Spare Parts 10.7 FRONT PART rock drill

Short Description:

Org.Number:
3115295000
Our Number:
7500001
Description:
FRONT PART
Weight Kg/Pcs:
10.7 KG

Product Detail

Product Tags

Here are some of our spare parts:

 

0144324803
5533770800 0.075
5534227000
5537886500 0.2
3217920649 0.025
3222326677 0.265
5112208381
5112208300
0500450011 0.12
3176404902 0.005
8231120035
0211196347 0.125
3222313717 0.363
3176651700
3176413000 0.745
3177309244
3217996603
3176655000
3217651302 0.035
3135211340
3217983446 0.01
3222306270 0.275
8231112714 0.138
8231120115
9106144615
3176458906 0.25
5534563400 0.015
3217781600
3176850901
0500450028 0.2
3176264400
3176713100
3176542700
9111373400
5541925000
5541353500 0.635
3222310757 0.325
5540116000
5532506800 0.127
3176000310 0.065
0211132703 0.015
3222331366 0.02
3222327756 0.58
4040015518
3362261647
3176000755
3176000273 0.03
3222334535 0.29
0501208915 0
5112315998 0.001
9102115702
3128308130 0.396
5726500091 0.01
1626088290
6060011173
3176000564 0.02
3222329021
3176003439 0.015
3176659400
3222333322 0.003
2914823600
4474304048
5541466000
3128306280 0.08
3128306282
0339100012
5724001134 0.815
5540849900 0.14
0501001902
5724411718 0.217
3092322057
3217927801
3217927701
5540633400 0.005
0017230755
3176010083
5535069300 0.001
5724003767 0.6
0147110628
5541024900 0.105
0686644504 0.031
2653290961 0.478
0663616700
0663617100
3217621800 0.06
5724001645 0.06
5724001649 0.09
5724600227 0.085
3217967403
5724003346
55165318 SEAL KIT 0.54 密封包
88637799 0.154 Electrical components
AF10140019 CONNECTOR R/B AF11419 RB 0.08 Hardware
55077880 ALTERNATOR 7.04 engine
04701398 STARTER 8.2 engine
71198847 STARTER 8.2 engine
AF21150088 BEARING 0.4 Hardware
55000928 CYLINDER hydro-cylinder
55001399 CYLINDER hydro-cylinder
04696702 SENSOR Electrical components

About us:

Established in 2011, JUNTAI is a company dedicated to making and selling after-market spare parts for Sandvik and Epiroc mining engineering machineries. Its parent company, Jinjiang Wantai, was established in 1989, with a plant area of 10,000, and its products have passed the ISO9001:2015 quality system certification. Yunnan Wantai, a subsidiary of the parent company, is one of the largest companies selling drilling rigs in southwest China.

 

Our Clients:

Power Construction Corporation of China, China Energy Engineering Corporation Ltd. China Railway Construction Corporation Ltd. Jinchuan Group Co., Ltd. Pangang Group Company Ltd. China Railway Tunnel Bureau Group Co., Ltd. China Wuyi Co., Ltd. CGC Overseas Construction Group Co., Ltd. Yunnan Phosphate Chemical Group Co., Ltd. Yunnan Tin Group Co., Ltd. Yunnan Copper Industry (Group) Co., Ltd. Yuxi Yukun Iron and Steel Co., Ltd. Yunnan Hualian Zinc& Indium Stock Co., Ltd. China Anneng Construction Group Co., Ltd.

 

 

Why Choose JunTai Machinery:

1.Industrial Experience

With 30 years of experience in making and selling construction machinery, the company has built a great client base and excellent reputation throughout China, and sold products to many foreign countries and regions.

 

2.Quality Assurance

All of our products are subject to strict testing and real machine inspection to ensure that all sold products could work as along as the service lives warrantied by original manufacturers.

 

3.Fast Delivery

We have large-scaled spare part warehouses in Fujian and Yunnan with comprehensive stocks to ensure timely delivery.

 

FAQS:

What are the main products of your company?

Spare parts for Epiroc and Sandvik machine, spare parts for drilling rigs, drilling jumbo, scrapers, the kinds of spare parts include JUNTAI (self-produced products), substitution (made in China or import from abroad), OEM (original equipment manufacturer).

 

What to offer for inquiry?

Please provide part number and actual demand quantity for inquiry. If the description is different with the part number, the part number prevails.

 

How long does our price valid?

Price lists are only valid for 30 days, follow the principle of priority sales.

 

Does this price include the duty

All prices are exclusive of 13% VAT and other taxes or official duties.

 

What about the terms of payment

30% advance payment, full payment  before delivery.

 

What about the typically delivery time?

We have spare part stocks in our warehouses, which can be shipped on each working day. In case no ready products available at warehouses, we can prepare for delivery after receiving 30% deposit. After receiving the prepared products at warehouse, the shipment could be arranged on the closest business day immediately. The delivery may be ahead of schedule or delayed due to inventories of raw materials or the number of orders.








  • Previous:
  • Next:

  • Write your message here and send it to us